Engineers Cadd Centre Pvt Ltd eccindia.org : Primavera Training Course

Company Name : Engineers Cadd Centre Private Limited (eccindia.org)
Training Offered : Primavera Training Course
Location : Hyderabad

Website : http://www.eccindia.org/

Primavera Training Course :
Who is Eligible –
Civil Engineers Should Complete their 3rd year engineering or CPM & PERT Concepts

Normal Fee : Rs.10000/

Course Outline :
Creating a Project :
** Create a project
** Navigate in the Projects window
** View and modify information in Project Details

Creating a Work Breakdown Structure :
** Define a Work Breakdown Structure
** Create multiple levels of a WBS hierarchy

Adding Activities :
** Describe an activity and its components
** Describe activity types
** Add activities
** Add a Notebook topic to an activity
** Add steps to an activity
** Assign activity codes to activities

Creating Relationships :
** View a network logic diagram
** Differentiate between the four relationship types
** Create relationships in the Activity Network
** Create relationships in Activity Details

Scheduling :
** Perform a forward and backward pass
** Describe float and its impact on a schedule
** Identify loops and open ends
** Calculate a schedule
** Analyze the scheduling log report

Assigning Constraints :
** Apply an overall deadline to a project
** Apply a constraint to an individual activity
** Add notebook topics to constrained activities
** Describe the available constraint types

Formatting Schedule Data :
** Group activities according to specific criteria
** Sort activities
** Apply a filter
** Create a filter

Roles and Resources :
** Describe roles
** Views the roles dictionary
** Describe resources
** Identify the differences between labor, nonlabor and material resources
** View the resource dictionary

Assigning Roles :
** Assign roles to an activity
** Assign rates on roles

Assigning Resources and Costs :
** Assign resources by role
** Assign labor, nonlabor, and material resources to activities
** Adjust Budgeted Units/Time for a resource
** Assign expenses to activities

Analyzing Resources :
** Display the Resource Usage Profile
** Format a profile
** Format the timescale

Optimizing the Project Plan :
** Analyze schedule dates
** Shorten a project schedule
** Analyze resource availability
** Remove resource overallocation
** Analyze project costs

Baselining the Project Plan :
** Create a baseline plan
** Display baseline bars on the Gantt Chart
** Modify the bars on the Gantt Chart

Project Execution and Control :
** Describe several methods for updating the project schedule
** Use Progress Spotlight
** Status activities
** Reschedule the project

Reporting Performance :
** Describe reporting methods
** Run a schedule report
** Create a resource report with the Report wizard
** Create a report using the current layout

Join Now

Contact Us :
Engineers Cadd Centre Private Limited
F10, 11, 12 – Eureka Court, Beside BATA
Near Chermas, Ameerpet
Hyderabad, AP-500 073, India

Categories: Training Institute
Jency:
www.indianjobtalks.in © 2021 Contact Us   Privacy Policy   Site Map