X

ulborissa.gov.in : Apply For New Water Connection Online Odisha

Name of the Organization : Odisha e-Municipality (ulborissa.gov.in)
Type of Facility : Apply New Water Connection Online
Location : Bhubaneswar

Website : https://ulborissa.gov.in/or/emun/home

Odisha e-Municipality Related Content:
Trade Licence Application: https://www.indianjobtalks.in/23744.html
Property/Holding Tax: https://www.indianjobtalks.in/23731.html

Water/Sewerage Connection and Charges :
The objective of Public Health Engineering Organisation, Govt. Of Odisha is to provide safe drinking water as well as hygienic sanitation system to all urban population.

The Department provides the following facilities to the citizens :
** Online Application for New Connection
** Check Application Status
** Search Consumer Details
** Water/Sewerage Bill Details
** Payment Details

Apply Online : https://ulborissa.gov.in/or/ulb/citi…er&ulb=%2Femun

New Water Connection Procedure :
Plan sanction is the initial stage of getting a connection. For obtaining water supply connection to a non Government building within a Urban Local Bodies and any other area where water supply is made from Water Works of such Bodies, the house owner will submit an application addressed to the Executive Engineer, Public Health Division or any Officer-in-charge along with a set of blue print plans in duplicate showing therein holding number, the layout of the premises, the proposed point of connection and fixtures and future extension if any, etc.,and the signature of the licensed plumber or contractor along with a non-refundable fees to cover the charges for scrutiny of plans and supervision

Documents Required :
1.A set of blue print of plans in duplicate
2.Holding number
3.Layout of the premises
4.Proposed point of connection
5.Fixtures and future extension if any
6.Licensed plumber or contractor
7.Non-refundable fees to cover the charges for scrutiny of plans and supervision

How and when to deposit Scrutiny Fee :
Consumer deposits the scrutiny fee at the cash counter and quotes No. to the plan section. Then plan section sends the plan to the maintenance division for sanction. After the plan gets sanctioned by the maintenance division , the consumer deposits the requisite fees and quotes the number of the plan section.After scrutiny and approval of plans the Executive Engineer/officer-in-charge,water works shall return one copy of the approved plans to the house owner and direct them to deposit a refundable amount which will be treated as deposit to be applied against damages done to the main water supply line or any other property of the govt.

How to Deposit Security Fee :
The consumers are allowed to give the security deposit either in cash or in National Savings Certificate or State Loan Boards to the Executive Engineer, or the Officer in Charge of the Water Works concerned, no interest will be paid to the consumer when the security is deposited in cash.

Rate of Security deposit on residential quarters owned by Government both State and Central, Corporation, Universities and Local Body.

Types of connections :
Type of Connections available are
1.Metered
2.Unmetered

Check Plan Approval/Connection Status :
From the web site click on the “Connection Status” Button. Then, enter the form number (application form no) and see the status on the web.

Check Status Here : https://ulborissa.gov.in/or/ulb/citi…%2Fwc%2Frender

Jency:
www.indianjobtalks.in © 2021 Contact Us   Privacy Policy   Site Map