Name of the Organization : Municipal Corporation of Greater Mumbai (mcgm.gov.in)
Type of Facility : New Water Line Connection Application Process
Location : Mumbai
Website : http://www.mcgm.gov.in/
Municipal Corporation of Greater Mumbai Related Content:
Establishments Registration: https://www.indianjobtalks.in/23643.html
Factory Permit Application: https://www.indianjobtalks.in/23648.html
Trade License Application: https://www.indianjobtalks.in/23652.html
Birth/ Death Certificate: https://www.indianjobtalks.in/12687.html
Pay Water Bills Online: https://www.indianjobtalks.in/3711.html
Drainage Connection:https://www.indianjobtalks.in/23632.html
Application For New Water Line Connection :
The Water Works Department is an Administrative Department of MCGM that issues various Permits in consultation with and advice from other technical advisory departments like Engineering, Assessment & Collection, Pest Control Department etc. In view of this, it is necessary to obtain Permit from Water Works department for new water connection.
Application for issuing new water line connection:
Category :
1.New Connection (Individual) :
Checklist :
1. Copy of valid IOD.
2. Set of approved plan ( certified copy).
3. SAppointment letter of Licensed Plumber.
4. Estimated cost of construction.
5. Pain bills of all existing CCMS.
6. C.C.
7. Full C.C.
8. D/T approved by LP ( up to Gr+7).
9. D/T approved by E ( 2 PTR) (for Gr+8 and above and requiring fire fighting arrangement).
10. MOC ( as applicable ).
11. Tanker water challans.
12. Special water requirement if any.
13. Representation of all occupants of building.
14. Copy of agreement between occupants and developers.
2.Existing Connection (Society) :
Checklist :
1. Copy of Latest water charges Bills paid.
2. For Commercial water connection, copy of License issued by the MCGM authority.
3. Slums (Stand Post Connection) :
Checklist :
1. Resolution of the Nal committee.
2. Ration card Xerox copies.
3. Electrol roll list ( prior to 1/1/1995 ).
4. Appointment letter of license plumber.
5. Location sketch showing structures of applicants.
Following Documents are required Only in case of Renewal/Transfer Applications along with the above documents :
6. Copy of Latest water charges Bill.
7. For Commercial water connection, copy of License issued by the MCGM authority.
Approving Authority :
Assistant Engineer Water Works/ Executive Engineer – WW, Dy Hydraulic Engg, Hy Engg depending on the diameter of pipe line)
Processing Duration :
Seven days (per scrutiny level) for all other applications from the date of submission of valid application along with required documents. (difficult to complete within 7 days. Some application take beyond 6 months.WW dept can processed the appln within 7 days provided A&C, AEE, PCO has approved it. Ie all tax are paid).
Application Scrutiny Levels :
Two levels scrutiny for all other applications. More than two depending on diameter of pipeline
Fees Applicable :
Scrutiny Fee payable at the time of submission of New Application
Schedule Fee payable after approval of application by the competent authority
Where to Apply :
Visit the any of the nearest Citizen Facilitation Center (CFC) established by the Municipal Corporation of Greater Mumbai. Shortly the Shop and Establishment Registration – Form A, can also be filled online by visiting Citizen portal on www.mcgm.gov.in,
How to Apply :
Applicant needs to submit the duly completed and signed application form, along with required documents and fees at the CFC.
Application Form :
Application will be available shortly. Currently applications are available at Citizen Facilitation Centers.
Contact Postal Address :
Municipal Corporation of Greater Mumbai,
Head Quarter,
Mumbai C.S.T. 400001
View Comments (29)
How much they cost for one connection they ask 60000 for connection. Who is responsible for this no one cares for poor people
I want new water connection whom do i contact, my location is sagar nagar slum, walkeshwar, mumbai 400006,
What is total cost for individual connection and joint connection.
Can I get installment to pay the amount
Zeeshan can I have ur number want to fix a new connection in Worli it's commercial property for my shop.
One connection of water for 16 families. Now with reduction in water supply negligible water is received and some of them go without water. A request is made to approve additional line so that water could be received at least for drinking purpose. May I request for additional connection for another 8 families.
I live in GORAI, BORIWALI WEST, MUMBAI. We don’t have any water connection by earlier. I want to apply for fresh water connection. In our society everybody have water connection excepting us, We bore our water from long or other area by cycle & suffering lot. So please help & guide the procedure to take new water connection.
My area is not slum & society here only we have water problem.
OUR HOUSING society has L.D. water connection. some of the flats are occupied. In the meanwhile, L.D. connection may be converted into H.D. connection. Please tell us a short procedure. Mr. Zeeshan of Omex Sanitation is requested to give the telephone number and address to approach.
Respected, I am not getting water since past 2 month. Ihave checked our motor, pipes.I complain to our ward. They checked and cannot find our line. Its too deep down. So how can I get my line above again Can you please help the needy.
I want to take on lease flat for commercial purpose in Residential society with common water supply. Can I have a separate connection for my commercial use? I want it for Beauty Parlour.
Our chawl had first one water tap in front of each row house ,as time went the water taps were cut and put into alternate rows, now that facility also left and the water is supplied from main connection with the help of motor and pipe for every alternate day which cost 500rs per month and is costly as per the use and supply of water. IS there any procedure to start water supply in front of our house with proper water meter?
How much does it cost for applying new water connection in Malad, West Slum?
Cost will be depend on the distance.